Chris Saint wrote:
Saints very own Media Manager has posted on Redvee, the plans are changing all the time but as far as he is aware the stadium will be enclosed.
It might be like Chair has suggested and open between the outer shell and the back of the terracing.
How can plans for a major construction project like a stadium change all the time? Wouldn't there be mountains of procedural and technical paperwork to get through to change a build post commencement?
I'm still waiting to see when my armrests are being installed. I only bought a season ticket because of those.