Re: Stadium Site pictures : Wed Apr 21, 2010 6:33 pm
getdownmonkeyman wrote:
Bowmer and Kirkland are bidding as a joint venture. B&K are looking at the Tesco side of things and a Leeds based contractor is looking at the stadium side (can't think of their name at the mo).
As for the precast side of things, are you saying they would be cast in-situ? I really can't see that as bringing the moulds to site would be as big a logistical task as bringing the units to site. That is even before considering the space required.
The only guys who have the capablity locally to manufacture terrace units are based in Bolton, but at the end of the day it will be a commercial decision.
As for the precast side of things, are you saying they would be cast in-situ? I really can't see that as bringing the moulds to site would be as big a logistical task as bringing the units to site. That is even before considering the space required.
The only guys who have the capablity locally to manufacture terrace units are based in Bolton, but at the end of the day it will be a commercial decision.
I would say that tayban in Bolton will do precast as is prob nearest to site.
I know the will be concrete going to site tomoz around dinner time. It looks like Tarmac topmix will be doing the concrete.